This Capital Improvement Plan (CIP) provides a recommended framework for undertaking major capital improvements over the next several years. The following goals continue to guide planning and prioritization of the CIP.

1. Provide a safe, healthy, and inviting learning environment for students, staff, parents, and community.
2. Protect infrastructure and ensure the proper operation of all critical building systems.
3. Ensure that facilities are energy efficient.

4. Ensure that facilities are equipped for current instructional and administrative technologies.

Identifying facilities needs are based on input from principals and administrators, facilities staff, and a range of consultants in the field. In 2021, Cornett & Cundiff, Inc. performed a survey of the roofs in the school division. In 2022-2023, Crabtree, Rohrbaugh & Associates completed a full facilities assessment to identify structural, mechanical, electrical, and plumbing needs for all school sites and assist with capital planning.

From the list of needs, major projects costing over $100,000 are included in the current CIP. As a caution, estimates should be considered place holders. The best estimates are obtained after preparation of working drawings (bid) documents and true cost is determined through the competitive bid process.

Timelines

The following timelines are hypothetical and predicated on the assumption that the division will increase its Facilities Category over each of the next several fiscal years. The following tables provide a description of projects, costs, and recommended timelines for each project. In some cases, projects are bundled for similar types of work or because of advantages related to logistics.

Capital Improvement Plan List

Priorities

Project

Description/Rationale

Cost 

Year

1.

Elevator Installation
GWC, CCE, DME

We currently have (3) elementary schools that are multi-level. Installing elevators would give students and staff access to each level while brining the building to ADA compliance.

Estimated
$3,200,000 1% sales tax

2025-2026

2.

Switchgear replacements FCMS and LPMS The main electrical switchgear is existing from when the school was built and in need of replacement at Fieldale-Collinsville Middle and Laurel Park Middle. 

$3,250,000

2025-2026

3.

HVAC Replacement FCMS The HVAC equipment at Fieldale-Collinsville Middle School has exceeded its life expectancy and is in need of replacement. This update would also improve the learning environment with updates to the indoor air quality.

$5,900,000

2025-2026

4.

HVAC Replacement SE The HVAC equipment at Sanville Elementary School has exceeded its life expectancy and is in need of replacement. This update would also improve the learning environment with updates to the indoor air quality.

$2,250,000

2025-2026

5.

Pavement Replacement STE and CA The pavement in the parking lots of Stanleytown and Career Academy is in need of replacement.

$1,500,000

2025-2026
 

6.

Roof coating/replacement AE The roof at Axton Elementary has exceeded its warranty and is in need of a new coating on part of the roof and replacement on other areas. 

$450,000

2025-2026
   

Total estimated cost for FY 2026

$16,550,000

 

1.

Pavement Replacement FCMS and LPMS The pavement in the parking lots of Fieldale-Collinsville Middle and Laurel Park Middle Schools is in need of replacement.

$2,750,000  

2026-2027

2.

Switchgear replacements BHS and MVH The main electrical switchgear is existing from when the school was built and in need of replacement at Bassett and Magna Vista High Schools. 

$3,250,000    

2026-2027

3.

Boiler Replacement MVHS, LPMS, CCE, and AE

The boilers at the listed facilities are 30 plus years old with several converted from coal to number 2 fuel oil. The boilers are in need of replacement. This will increase efficiency of our heating system and improve energy cost.

$2,200,000   2026-2027
    Total estimated cost for FY 2027

$8,200,000

 
1. Renovations to Sanville The main electrical switchgear is existing from when the school was built and in need of replacement.

$4,600,000

2027-2028

2.

Generators Bus garage, DME, GWC, CCE, MTO, AE, FCMS

      $1,250,000

2027-2028

3.

Roof Replacement

CCE - Replacement of EPDM roof that has been out of warranty since 2022.

$1,375,000

2027-2028
    Total estimated cost for FY 2028

$7,225,000

 

1.

HVAC Upgrades CCE - Replacement of chiller and associated HVAC equipment

$3,300,000

2028-2029

2. HVAC Upgrade DME - Replacement of HVAC equipment

$3,300,000

2028-2029
3. HVAC Upgrade DME - Replacement of HVAC equipment

$3,300,000

2028-2029
    Total estimated cost for FY 2029 $9,900,000  
1.

Roof Replacement

DME - Replacement of EPDM roof that has been out of warranty since 2022.

$1,375,000

2029-2030

2.

Roof Replacement

GWC - Replacement of EPDM roof that has been out of warranty since 2022.

$1,375,000

2029-2030

    Total estimated cost for FY 2030 $2,750,000  
1. Additions to Career Academy Additions to the Career Academy will be based on the instructional needs of students and future programs. TBD TBD